# ISO/IEC 27001:2022 A.5.8 — Information security in project management

- Source: https://support.icompaas.com/compliance/iso-27001-2022/a-5-8-information-security-in-project-management
- Section: [Compliance](https://support.icompaas.com/compliance) › [ISO/IEC 27001:2022 Annex A Controls](https://support.icompaas.com/compliance/iso-27001-2022) › Organizational controls
- Last updated: 2026-06-05
- Publisher: iCompaas, Inc. (https://www.icompaas.com)

**ISO/IEC 27001:2022**·Annex A `A.5.8`·high·Component: **Organizational controls**

## What this control requires

> Information security shall be integrated into project management.
> 
> — ISO/IEC 27001:2022, Annex A A.5.8

### In plain English

Information security shall be integrated into project management. In practice, this means you can prove you information information security-level controls on a defined cadence.

## Why it matters

ISO 27001 certification depends on showing each Annex A control is either implemented or explicitly justified for exclusion in the Statement of Applicability (SoA). Certification bodies sample controls during surveillance audits, and a missing SoA entry — or implementation that doesn't match the SoA wording — is a finding.

This control is rated **high**. Auditors expect a named owner, a remediation SLA, and a tooling artefact that evidences continuous operation.

## What an auditor looks for

An ISO 27001 lead auditor looks for: (1) an SoA entry covering the control with justification, (2) a documented procedure or policy implementing it, (3) records that prove the procedure runs (logs, tickets, training records) and (4) management-review evidence that effectiveness is monitored.

Within **Organizational controls**, the assessor will trace your implementation back to the catalogue reference (Annex A A.5.8) and look for objective evidence on the latest two assessment cycles.

## How to implement

#### Incident Response

**Runbook.** Maintain a runbook keyed by incident type with named roles (IC, comms, scribe), an out-of-band comms channel, and a 72-hour timeline for external notification.

**Tabletop.** Run a quarterly tabletop exercise (ransomware, insider, supply-chain) and feed gaps back into the runbook.

### Operational checklist

-   **Information.** Document the trigger, the owner and the cadence.
-   **Management.** Document the trigger, the owner and the cadence.
-   **Response.** Document the trigger, the owner and the cadence.
-   **Security.** Document the trigger, the owner and the cadence.
-   **Change.** Document the trigger, the owner and the cadence.
-   **Scope:** information security, management.

## Evidence to collect

-   **Ticketing Workflow.** `ticketing_workflow` evidence
-   **Infra Scan.** Continuous infrastructure-posture telemetry — AWS Config, Azure Policy compliance, GCP Organisation Policy, Wiz / Prisma findings.

Workflow metrics (ServiceNow, Jira) show approvals and remediation. Focus: Information security in project management.

## Common pitfalls

-   Runbooks that name a role but no person, or list a paging channel that no longer exists.

## How it maps to other frameworks

Computed from shared tags, control component and key-operation subjects — handy when you are reconciling controls across an audit.

-   [**NIST SP 800-53 Rev. 5 SA-9(1)** — Risk Assessments And Organizational Approvals](https://support.icompaas.com/compliance/nist-sp-800-53-rev-5/sa-9-1-risk-assessments-and-organizational-approvals)
-   [**NIST SP 800-171 Rev. 3 3.6.2** — Incident Monitoring, Reporting, and Response Assistance](https://support.icompaas.com/compliance/nist-sp-800-171-rev-3/3-6-2-incident-monitoring-reporting-and-response-assistance)
-   [**BSI C5:2020 AM-04** — Decommissioning of Hardware](https://support.icompaas.com/compliance/bsi-c5-2020/am-04-decommissioning-of-hardware)
-   [**SOC 2 (2017 TSC) CC7.4** — Incident Response](https://support.icompaas.com/compliance/soc-2-trust-services-criteria/cc7-4-incident-response)
-   [**HIPAA (45 CFR Part 164) 164.308(a)(5)(i)** — Security Awareness and Training](https://support.icompaas.com/compliance/hipaa/164-308-a-5-i-security-awareness-and-training)

## Related controls in ISO/IEC 27001:2022

-   [**Annex A A.5.24** — Information security incident management planning and preparation](https://support.icompaas.com/compliance/iso-27001-2022/a-5-24-information-security-incident-management-planning-and-preparation)
-   [**Annex A A.5.27** — Learning from information security incidents](https://support.icompaas.com/compliance/iso-27001-2022/a-5-27-learning-from-information-security-incidents)
-   [**Annex A A.5.1** — Policies for information security](https://support.icompaas.com/compliance/iso-27001-2022/a-5-1-policies-for-information-security)
-   [**Annex A A.5.4** — Management responsibilities](https://support.icompaas.com/compliance/iso-27001-2022/a-5-4-management-responsibilities)
-   [**Annex A A.5.12** — Classification of information](https://support.icompaas.com/compliance/iso-27001-2022/a-5-12-classification-of-information)
-   [**Annex A A.5.29** — Information security during disruption](https://support.icompaas.com/compliance/iso-27001-2022/a-5-29-information-security-during-disruption)

## References

-   [ISO/IEC JTC 1/SC 27 — ISO/IEC 27001:2022](https://www.iso.org/standard/27001)
-   Catalogue identifier: `Annex A A.5.8`

Topics: governance riskchange managementincident response

## Related compliance guidance

- [ISO/IEC 27001:2022 compliance: a practical implementation guide](https://support.icompaas.com/compliance/iso-27001-2022): Start with the full ISO 27001 implementation guide — scope, roadmap, evidence and how the assessment runs.
- [SOC 2 compliance: a practical implementation guide for cloud-native SaaS teams](https://support.icompaas.com/compliance/soc-2-trust-services-criteria): Most companies that hold ISO 27001 also need a SOC 2 report for North American customers, and the two share most of their technical controls.
