CM-3(2)·high·Component: Configuration ManagementWhat this control requires
Tests, validates, and documents system changes before final implementation to ensure no adverse security or privacy impacts. This control supports the Change Validation System capability within the Configuration Management family.
In plain English
Tests, validates, and documents system changes before final implementation to ensure no adverse security or privacy impacts. In practice, this means you can prove you policy management-level controls on a defined cadence.
Why it matters
SP 800-53 is the catalogue every U.S. federal authorisation (FedRAMP, FISMA, CMMC) and most regulated industries point at. A missing control surfaces as a Plan of Action & Milestones (POA&M) item that an Authorizing Official must approve before the Authority To Operate is granted or renewed.
This control is rated high. Auditors expect a named owner, a remediation SLA, and a tooling artefact that evidences continuous operation.
What an auditor looks for
A 3PAO (FedRAMP) or Independent Assessor (NIST RMF) tests against NIST SP 800-53A assessment procedures. For each control they expect a documented implementation that addresses every assessment objective (Examine, Interview, Test) and an implementation summary in the System Security Plan.
Within Configuration Management, the assessor will trace your implementation back to the catalogue reference (Control CM-3(2)) and look for objective evidence on the latest two assessment cycles.
How to implement
Policy Management
Docs. Keep each policy in version-controlled Markdown alongside the code that implements it; ship a signed PDF snapshot at each annual review and link the SHA into the SoA.
Code Review Testing
Pipeline. Require at least one human reviewer plus passing CI (lint, type, unit, security scan) before merge — protected branches enforce this.
Operational checklist
- Policy. Document the trigger, the owner and the cadence.
- Security. Document the trigger, the owner and the cadence.
- Configuration. Document the trigger, the owner and the cadence.
- Validation. Document the trigger, the owner and the cadence.
- Review. Document the trigger, the owner and the cadence.
- Scope: management, privacy, system, configuration, system changes, review, capability, documents.
Evidence to collect
- Policy Document. A signed and version-controlled policy / standard / procedure document.
Signed policy or standard documents the safeguard. Focus: Testing, Validation, And Documentation Of Changes.
Common pitfalls
- Policies that no engineer has read; the version in Confluence drifts from the version that's actually being enforced.
How it maps to other frameworks
Computed from shared tags, control component and key-operation subjects — handy when you are reconciling controls across an audit.
- NIST SP 800-171 Rev. 3 3.4.11 — Information Location
- HIPAA (45 CFR Part 164) 164.308(a)(5)(i) — Security Awareness and Training
- BSI C5:2020 SP-02 — Review and Approval of Policies and Instructions
Related controls in NIST SP 800-53 Rev. 5
- Control CM-4(1) — Separate Test Environments
- Control CM-3(7) — Review System Changes
- Control CM-4 — Impact Analyses
- Control CM-4(2) — Verification Of Controls
- Control SI-6(2) — Automation Support For Distributed Testing
- Control CM-3(8) — Prevent Or Restrict Configuration Changes
References
- NIST Computer Security Resource Center — NIST SP 800-53 Rev. 5
- Catalogue identifier:
Control CM-3(2)
Topics: governance riskpolicy managementcode review testingprivacy management