ISO/IEC 27001:2022·Annex A A.5.30·high·Component: Organizational controls

What this control requires

Information and Communication Technology (ICT) readiness shall be planned, implemented, maintained and tested based on business continuity objectives and ICT continuity requirements.
— ISO/IEC 27001:2022, Annex A A.5.30

In plain English

Information and Communication Technology (ICT) readiness shall be planned, implemented, maintained and tested based on business continuity objectives and ICT continuity requirements. In practice, this means you can prove you policy management-level controls on a defined cadence.

Why it matters

ISO 27001 certification depends on showing each Annex A control is either implemented or explicitly justified for exclusion in the Statement of Applicability (SoA). Certification bodies sample controls during surveillance audits, and a missing SoA entry — or implementation that doesn't match the SoA wording — is a finding.

This control is rated high. Auditors expect a named owner, a remediation SLA, and a tooling artefact that evidences continuous operation.

What an auditor looks for

An ISO 27001 lead auditor looks for: (1) an SoA entry covering the control with justification, (2) a documented procedure or policy implementing it, (3) records that prove the procedure runs (logs, tickets, training records) and (4) management-review evidence that effectiveness is monitored.

Within Organizational controls, the assessor will trace your implementation back to the catalogue reference (Annex A A.5.30) and look for objective evidence on the latest two assessment cycles.

How to implement

Business Continuity

BC/DR. Define RTO/RPO per service, test backup restoration quarterly, and run a tabletop of full-region failover annually.

Backups. Immutable backups (S3 Object Lock / Azure immutable storage / GCS bucket lock) plus an air-gapped copy for ransomware resilience.

Policy Management

Docs. Keep each policy in version-controlled Markdown alongside the code that implements it; ship a signed PDF snapshot at each annual review and link the SHA into the SoA.

Operational checklist

  • Policy. Document the trigger, the owner and the cadence.
  • Management. Document the trigger, the owner and the cadence.
  • Scope: management.

Evidence to collect

  • Policy Document. A signed and version-controlled policy / standard / procedure document.
  • Infra Scan. Continuous infrastructure-posture telemetry — AWS Config, Azure Policy compliance, GCP Organisation Policy, Wiz / Prisma findings.

Signed policy or standard documents the safeguard. Focus: ICT readiness for business continuity.

Common pitfalls

  • DR plans that have never been tested in earnest, or that depend on an MFA token only one person can produce.
  • Policies that no engineer has read; the version in Confluence drifts from the version that's actually being enforced.

How it maps to other frameworks

Computed from shared tags, control component and key-operation subjects — handy when you are reconciling controls across an audit.

Related controls in ISO/IEC 27001:2022

References

Topics: governance riskbusiness continuitypolicy management