A.3.31·high·Component: Security considerationsWhat this control requires
Protect and manage test information related to PII processing; avoid use of real PII where possible. Implementation: Use synthetic data or equivalent protections; document selection and controls. Justification: Prevents leakage of PII through test environments.
In plain English
Protect and manage test information related to PII processing; avoid use of real PII where possible. In practice, this means you can prove you implement test information-level controls on a defined cadence.
Why it matters
ISO 27701 is the international way to evidence the GDPR principle of accountability: certified PIMS controls translate directly into the records, contracts and rights-handling that supervisory authorities want, and into the privacy-engineering evidence SOC 2 + Privacy auditors and enterprise procurement teams ask for.
This control is rated high. Auditors expect a named owner, a remediation SLA, and a tooling artefact that evidences continuous operation.
What an auditor looks for
PIMS auditors expect ISO 27001 to be implemented first and then the 27701-additional controls tested. For PII controllers they look at lawful-basis and rights-handling evidence; for PII processors they look at customer-instructions, sub-processor controls and return/transfer/disposal evidence.
Within Security considerations, the assessor will trace your implementation back to the catalogue reference (Annex A A.3.31) and look for objective evidence on the latest two assessment cycles.
How to implement
Secure Development
Pipeline. Require code review, SAST (Semgrep / Snyk Code), SCA (Dependabot / Renovate), secret-scanning and IaC scanning in the merge pipeline.
Branch protection. Protected branches enforce reviews, signed commits and passing CI before merge; document the protection rules as the control evidence.
Operational checklist
- Implement. Document the trigger, the owner and the cadence.
- Document. Document the trigger, the owner and the cadence.
- Protect. Document the trigger, the owner and the cadence.
- Scope: test information.
Evidence to collect
- Policy Document. A signed and version-controlled policy / standard / procedure document.
Signed policies, procedures, and registers document the safeguard. Focus: Test information.
Common pitfalls
- CI security checks set to warn-only; the merge button is faster than the security feedback.
Related controls in ISO/IEC 27701:2025
- Annex A A.3.6 — Labelling of information
- Annex A A.3.24 — Information backup
- Annex A A.1.4.2 — Limit collection
- Annex A A.1.4.3 — Limit processing
- Annex A A.1.4.4 — Accuracy & quality
- Annex A A.1.4.6 — De-identification / deletion
References
- ISO/IEC JTC 1/SC 27 — ISO/IEC 27701:2025
- Catalogue identifier:
Annex A A.3.31
Topics: data protectionsecure developmentdata loss prevention